Overall Dashboard Filter - 30 days.

Filters available:
    ○ Engineer
    ○ Travel Date

Productive Time - Total Productive hours of Engineers.
Total Labour Time - Total Labour hours of Engineers.
Total Labour Time / On Call - Total Labour / On Call hours of Engineers.
Total Travelling Time - Total Travelling hours of Engineers.
Total Travelling Time / On Call - Total Travelling / On Call hours of Engineer.
Total Non-Productive Time - Total Non-Productive hours of Engineer.
Total Unreported Time - Total Unreported hours of Engineer.
Total Unreported Time / On Call - Total Unreported / On Call hours of Engineer.
Labour Hours - Doughnut Chart: Total Labour/Labour-On Call Hours of Engineers
Travel Hours - Doughnut Chart: Total Travel/Travel-On Call Hours of Engineers.
Unreported Hours - Doughnut Chart: Total Unreported/Unreported-On Call Hours of Engineers.
Engineer Analysis - Clustered Graphical Representation: Engineer Hours Classified into Productive, Non-Productive, and Unreported Categories, Including On-Call Hours.
Details Table - Daily Details Based on Applied Filters: This Table Provides Per Day Information According to the Filters Applied. The Data Can be Downloaded, and Additional Filters Can be Applied to the Exported Data.

Note:
Explanation of Percentages:
    ○ 100% = Productive Time + Total Non-Productive Time + Total Unreported Time + Total Unreported Time/On-Call.
    ○ Productive Time = Total Labour Time + Total Labour Time/On-Call + Total Travelling Time + Total Travelling Time/On-Call.